  • Q: How long does it take to build a 100MW Power Plant?

    Depending on the location and permit requirements, it takes between 18 months to 24 months after the permit is approved.

  • Q: How much does it cost to build a 100MW Power Plant?

    The cost varies from country to country as most of the components can be built locally under license.

  • Q: Can you give me a ball park estimate?

    The estimate is approximately 70% of the average price to build the same Power Plant in the same location.

  • Q: What is the cost of a Powerdyne Power Plant in the USA?

    Call +1 949 251 0620 or email info@powerdyne.com

  • Q: Where is the black box?

    The black box is our boiler system.

  • Q: Approximately how much space is needed?

    Approximately 100’ X 300’.

  • Q: How long will the power plant be out of service?

    The power plant is not taken out of commission as the  Powerdyne System can be installed concurrently while the existing plant is still producing power and can be valved into the existing steam line when final testing is completed. The old boiler equipment can then be removed.

  • Q: What happens to the ash?

    The Powerdyne system does not produce ash.

  • Q: What happens to the remaining CO2?

    The CO2 is ready for sequestration,commercialization or it can be vented under current EPA guidelines.

  • Q: How much water is consumed in the Powerdyne System?

    The water is completely returned in a closed loop system.

200 OK

OK

The server encountered an internal error or misconfiguration and was unable to complete your request.

Please contact the server administrator, [no address given] and inform them of the time the error occurred, and anything you might have done that may have caused the error.

More information about this error may be available in the server error log.